These projects was for the same company but in two different area's in the UK between 2006 - 2009
IKEA Gateshead, UK 2006 (Stubbs Rich Architects) & Ikea Belfast, UK 2008-2009 (Stubbs Rich Architects)
After a brief introduction to IKEA projects and philosophy, learning microstation, and the ways of the new office, I was added to the IKEA Gateshead team to prepare package drawings. It was not long before I was promoted to Project Leader. There was so much to learn and be mindful of. I was responsible for the detail design of the lift shafts and escalators as well as overseeing package delivery, attending meetings etc and the design of the extension into an adjacent existing warehouse building purchased by IKEA.
Work had already started on site when I was handed this project to lead. The team was behind on delivery of the different packages. No sooner had I taken over the project and the Contractor informed us of a major change in the order of the packages in that they planned to do the carpark building far sooner than expected. Fortunately I worked very closely with the Director and Associate overseeing the project. It was a case of all hands on deck and they became part of my team until we overcame the hurdle and were back on track. In this project the aim was to get the structure and roof up first to minimise delays from inclement weather. It paid off and was the fastest build to date at that time.